The Winter Olympic Games were inaugurated today in the city of Sochi in Russia, and will last until 23 February
2014. The Coastal Cluster, along the Black
Sea in the Adler district of the City of Sochi,
is where most events will take place during the 2014 Olympic Games.
The Olympic Park is located in what was once a
swamp. The chief architect of Sochi's
2014 Oleg Kharchenko, of construction company Olympstroy, sought inspiration from previous Olympic
Games host cities to transform a "swamp" into an expanse of beauty.
Ice Cube Curling Center
Ice Cube Curling Center
The "Ice Cube" Curling Center
is located in the Coastal Cluster, within the grounds of the Olympic Park. The
"Ice Cube" Curling
Center is simplistic in
its design, which symbolizes democracy, and accessibility alongside the
festivity, which is characteristic of the Olympic and Paralympic Games. The Ice
Cube Curling Centre is one of the key sports facilities within the Olympic
park.
Taking inspiration from the shape of a curling
stone, the designers specified hi-tech materials in different tones varying
from gray to silver to decorate the curving structure. The building has been
clad with ‘sandwich’ panels applied as element-by-element assembly, the key
elements of which include base structure, insulation, membrane and exterior
cladding.
The ice rink hosted the Wheelchair Curling
World Cup followed by the Junior Curling World Cup in March. Competitors,
officials and spectators alike were full of praise for the quality of the rink
and the arena as a whole. The "Ice Cube" Curling Center
is a moveable venue, making it possible to be dismantled and transported for
post-Games use as a curling center in another Russian city.
Capacity: 3,000
Construction cost: $14 million
Events: Curling
After the Games: Could be relocated to another
Russian city
Adler Arena
Adler Arena
The Adler Arena is an oval-shaped facility with
two competition tracks and one training track. The size of the Adler Arena
meets the requirements of the International Skating Union (the track length is 400 m). In particular, the
ice track is designed to provide the best chronometric performance. The roofed
Adler Arena is located in the center of the Olympic Park.
The Adler Arena has been designed as an
oval-shaped stadium with two competition tracks and one training track. The
dimensions of the Adler Arena meet the requirements of the International
Skating Union (track length: 400
m). In particular, the ice track has been designed with
optimal micro-climatic conditions to ensure ice suitable for world class speed
skating events.
Adler Arena
Project: Bob Johnston of CannonDesign
Capacity: 8,000
Construction cost: $32.8 million
Events: Speed skating
After the Games: Exhibition center
Iceberg Skating Palace
Iceberg Skating Palace
The Olympic Skating Center plays a crucial role
in the Sochi 2014 concept. The Olympic Skating Center is a moveable venue. As
such, it is located at the heart of the Coastal Cluster – Olympic Park. The
Olympic Skating Center is a moveable venue, making it possible to be dismantled
and transported for post-Games use as a skating center in another Russian city.
The name evokes associations with the
architectural shapes of the venue. It is an international word and sounds the
same in a number of language including Russian, English and German. Audience
seats are designed in two tiers. Placed between the tiers lie level VIR For the
convenience of visitors and reduce the time of loading and unloading of the Ice Palace,
the foyer of the first and second tiers of the stands, connected by galleries around
the perimeter of the building and stairs.
On the outside, these internal stairs rise to
the construction of the facade and in their places of recovery emphasize inputs
viewers. Figure interlocking waves formed on the facade of glass and sandwich
panels, painted in several shades of blue , designed to combine the palace with
the silhouettes of the surrounding mountains and the waves of the Black Sea.
Iceberg Skating Palace
Project: GUP MNIIP mosproject-4
Capacity: 12,000
Construction cost: $43.9 million
Events: Figure skating, short track speed
skating
After the Games: Undecided. Options include
skating rink, cycling velodrome











No comments:
Post a Comment
What do you think?