The new auditorium with the
main entrance foyer completes the program of the youth music school, finished
in 1999. The extension, which was designed 10 years after the original project,
is located in the narrow space between the old school and the new youth music
school and creates a new passage between them.
The building is situated between these trees and the volumetric quality of the trees mixes with the transparent facade of the new school. Behind this facade is the waiting area for the pupils – almost like teaching under trees. The new building is incomplete without the existing buildings of the surrounding and tries to recognize the existing context.
The new complex gets its
character by intertwining with the existing trees and continuing this landscape
within the building itself. The school is divided into two main parts; a public
area (Café, lecture rooms etc.) and the private area (classroom, administration
area), which are connected by a common entrance which can also be used
separately.
The café opens to the yard and a “park”, the teachers´room can be connected to this café. For functional and acoustical reasons, the classrooms are separated from the administration area on different floors. The administrative area is situated in the groundfloor, with areas for information and public relations found close to the main entrance.
The classrooms are in the
first and second floor, in front of them there is a waiting zone “between” the
trees. A construction of a series of ramps and different staircases leads from
the entrance hall to the auditorium on the first floor. This link from the
entrance to the second floor allows for a cerimonious procession for guests and
serves as the backdrop for public addresses.
The auditorium is elevated to the first floor, giving the opportunity of an open space in the ground floor which contains the main foyer and a big multipurpose space. The auditorium is visible as an unregular round shape with a gallery level. The façade is covered by bricks, referring in material and shape to the existing buildings build 10 years ago. A visible ornamentation in the bricks refers to sound waves and indicates the content of the building in the exterior.
The material for the
facades are brickwork – yellow and red – and a steel-glass-construction with
colored metal-panels for the street facade. As one of the main elements of this
project. The landscape is continuously reinforced within the building- glass
and steel panels wrap around existing trees- bricks firmly set within the earth
echo towards the nearby school.
The structure which
supports the street facade is made of round pillars and beams shaped like
fragments of trees standing as a metaphor for the trees outside of this
building. A folded entrance roof covers the foyer and connects with the ramp of
the existing music school in the upper floor.
Another important element
is the inner concrete wall which is cladded for acoustic reasons with panels
painted in different colors with a similar idea of stripes like in the outside
facade.
Introducing color to the facades could bring joy to the school. The whole of these elements – color and light – connecting landscape to structure expresses within a building the energy and youth of children and music.
Location: Hamburg, Germany
Architect:
Miralles Tagliabue EMBT
Collaborators: Stefan Geenen, Verena Vogler, Max Gunst, Carmen Fischer, Gabriele
Rotelli, Shavleg Chichishvili, Davide Argenteri, Kataryna Golab
Construction: WTM Engineers
Acoustic: Beratungsbüro
Für Bau-und Raumakustik, HCON, HILS Consult
Contractor:
Billfinger+Berger
Area: 1,000 m2
Year: 2011
Cost: 7,500,000 €
Client: Freie
und Hansestadt Hamburg,
Behöre Für Schule und Berusfsildung














No comments:
Post a Comment
What do you think?