The European Commission and the Fundació Mies van der Rohe have announced the five finalists who will compete for the 2013 European Union Prize for Contemporary Architecture – Mies van der Rohe Award. Harpa is one of the five nominated buildings.
Situated on the border
between land and sea, the Concert Hall stands out as a large, radiant sculpture
reflecting both sky and harbour space as well as the vibrant life of the city.
The Concert Hall of 28,000 m2 is situated in
a solitary spot with a clear view of the enormous sea and the mountains
surrounding Reykjavik.
The building features an arrival and foyer area in the front of the building,
four halls in the middle and a backstage area with offices, administration,
rehearsal hall and changing room in the back of the building. The three large
halls are placed next to each other with public access on the south side and
backstage access from the north. The fourth floor is a multifunctional hall
with room for more intimate shows and banquets.
Seen from the foyer, the
halls form a mountain-like massif that similar to basalt rock on the coast
forms a stark contrast to the expressive and open facade. At the core of the
rock, the largest hall of the building, the main concert hall, reveals its
interior as a red-hot centre of force. The project is designed in
collaboration with the local architectural company, Batteríið Architects.
Harpa - Reykjavik Concert
Hall and Conference Centre forms part of an extensive harbour development
project in Reykjavik,
the East Harbour Project. As the name indicates, the overall objective of the
project is to expand and revitalise Reykjavik's
eastern harbour with a new downtown plaza, a shopping street, a hotel,
residential buildings, educational institutions and mixed industry. The
overall intention is to generate life in the area and to create a better
connection between the city centre and the harbour.
Situated outside the city's
building mass, the building will become a significant icon in the city - a
visual attractor with a powerful and varying expression. The isolated location
will mean that, to a great extent, the changing climatic and light effects will
be exposed in the facades of the concert building, often in contrast to the
narrow and shady streets in the rest of the city. As the rest of the building,
the design of the facades is inspired by nature. In particular, the
characteristic local basalt formations have provided the inspiration for the
geometric facade structure.
Made of glass and steel in a twelve-sided space-filling geometric modular system called the 'quasi-brick', the building appears a kaleidoscopic play of colours, reflected in the more than 1000 quasi-bricks composing the southern facade. The remaining facades and the roof are made of sectional representations of this geometric system, resulting in two-dimensional flat facades of five and six-sided structural frames. In order to develop these ideas the team worked with three-dimensional computer models, finite element modelling, various digital visualisation techniques as well as maquettes, models and mock-ups.
Light and transparency are
key elements in the building. The crystalline structure, created by the
geometric figures of the facade, captures and reflects the light - promoting
the dialogue between the building, city and surrounding landscape. One of the
main ideas has been to "dematerialise" the building as a static
entity and let it respond to the surrounding colours - the city lights, ocean
and glow of the sky. In this way, the expression of the facade changes
according to the visual angle. With the continuously changing scenery, the
building will appear in an endless variation of colours.
The Concert Hall and
Conference Centre is part of an extensive harbour development project in Reykjavik - the East
Harbour Project. The project was initiated in 2004 as an PPP competition, which
means that the competing project groups - consisting of both private and public
parties - are responsible for investments, construction and operations
themselves. However, due to the difficult economic situation that Iceland has
found herself in since autumn 2008, the municipality of Reykjavik and the
Icelandic Government has attended to the completion of the project themselves.
Henning Larsen Architects
applied for the prequalification and won the competition together with the team
Portus Group consisted of the contracting company IAV, the operating company
Nysir, private investor Landsbanki, the engineering company Rambøll, the local
engineers Mannvit, the local company Batteríið Architects, the artist Olafur
Eliasson and the company Artec Consultants from New York providing consulting
services in acoustics.
The extensive international
collaboration has resulted in entirely new work processes in which a high
degree of information sharing and communication has been a both demanding and
rewarding dimension. In 2008, an exhibition at Reykjavik Visitor Centre has
provided visitors with an insight into the process and the many different
parties' approaches and demands.
Location: Reykjavik, Iceland
Architects: Henning Larsen Architects and Batteriid Architects
Landscape architects: Landslag efh and Lisbeth Westergaard
Façade design and development: Olafur Eliasson and Studio Olafur Eliasson in collaboration with Henning Larsen Architects
Owner and operator: Harpa, Portus Group, AGO (operator of Harpa), Totus (owner of Harpa)
Engineers: Artec Consultants, Mannvit Engineers, Hnit Consulting Engineers, Efla Engineers, ArtEngineering, and Ramboll
Acoustics: Artec
Contractor: IAV
Design Manager: IAV
Other consultants: ASK Architects, Almenna Consulting Engineers, Verkis Consulting Engineers, Verkhönnun Engineers, Jasper Parrott (international consultant), and Vladimir Ashkenazy (artistic adviser)
Team from Henning Larsen Architects: Responsible partner: Peer Teglgaard Jeppesen - Architect and design Manager: Ósbjørn Jacobsen - Project manager: Klavs Holm Madsen - Façade specialist: Steen Elsted Andersen - Team of architects: Andrea Tryggvadóttir, Birthe Bæk, David Garcia, Debbi Hedeham, Thuesen, Diana Arsovic Hareskov, Nielsen, Elizabeth Balsborg, Filip Lyders Francati, Hannibal Hink, Helga Vilmundardóttir, Ina Borup, Sørensen, Ingela Larsson, Jørgen Olesen, Katja Brandt Lassen, Kristian Svejborg Olesen, Lars Harup, Leif Andersen, Leonardo Paes Resende, Lisbeth Leth-Sonne, Martha Lewis, Matthias Lehr, Mette Kynne Frandsen, Mette Landorph, Merete Alder Juul, Morten Hauch, Niels Gravergaard, Rasmus Haak, Steen Elsted, and Vanda Oliveira
Team from Batteriid Architects: Responsible partner: Sigurður Einarsson - Team of architects: Soffía Valtýsdóttir, Jón Ólafur Ólafsson, Guðmundur Ósvaldsson, Arnar Skjaldarson, Sigurbjartur Loftsson, Ingvi Þorbjörnsson, Grétar Snorrason, Áslaug Elísa Guðmundsdóttir, Jón Benjamín Einarsson, Þórdís Halldórsdóttir, Ellen Tyler, Arnór Skúlason, Anders Möller Nielsen, Erlingur Snær Erlingsson, Hjálmar Örn Guðmarsson, Berta Ósk Stefánsdóttir, Tryggvi Tryggvason, and Christian Faurschou
Team from Studio Olafur Eliasson: Responsible architect: Sebastian Behmann - Project architect: Ben Allen - Geometry development: Einar Thorsteinn
Gross floor area: 28,000 m2
Year: 2011
Client: Austurnhofn TR – East Harbour Project Ltd.
Type of assignment: First prize in international PPP competition, 2005
Client: Austurnhofn TR – East Harbour Project Ltd.
Type of assignment: First prize in international PPP competition, 2005